Crystal Creek Cable Suspension Bridge.

Crystal Creek Cable Suspension Bridge.

Client: Olympic National Park Service
150’ Cable Suspension Bridge located in the ONP. This project was located in a very remote location which was accessible by motorized vehicle to only one side. Very challenging site due to near vertical topography. Use of a “high line” was needed to move excavator, material and supplies to far side of bridge to complete project. All structural steel was A588.

Staircase Rapids Cable Suspension Bridge.

Staircase Rapids Cable Suspension Bridge.

Client: Olympic National Park Service
210’ Cable Suspension Bridge located in the ONP. All material, equipment and supplies were flown in via “heavy lift” helicopter as there was NO motorized access to the site. All structural steel was A588.

Station Camp Middle Park Village Board Walk and Overview.

Station Camp Middle Park Village Board Walk and Overview.

Client: National Park Service
Multiple boardwalks located by Chinook Washington at the Lewis and Clark campsite. This project consisted of 3 different boardwalks that was A588 structural steel posts set on top of Diamond Pier pads. A588 structural steel beams and then placed precast concrete planks for the walking surface. Hand railing consisted of cedar post and Top rail, Stainless Steel Wire rope was for railing.

MC-50 Bridge.

MC-50 Bridge.

Client: Washington State DNR
Installation of 16’x75’ bridge

Houghton Bridge.

Houghton Bridge.

Bank of the West.

Bank of the West.

Port of Morrow.

Port of Morrow.